
New Cairo & Greater Cairo
Saunas, steam rooms and cold plunge tubs for New Cairo, Sheikh Zayed, Katameya, Maadi and Zamalek homes. Facto…
Read more →Egypt's Mediterranean coast is three markets on one shoreline: Sahel second homes that fill for the summer and close for the rest of the year, New Alamein towers and hotels still rising, and Alexandria, a humid old city where ventilation decides everything. Salt is lighter here than on the Red Sea; humidity is heavier.
In this guide: North Coast (Sahel) · New Alamein · Alexandria

In the Sahel villages the brief is a sauna and cold plunge for July to September, built and commissioned in the months when the coast is empty and left with a written shutdown routine. In New Alamein the work is hotels, towers and branded apartments, where we join the main contractor's programme and keep the on-site window short because the rooms arrive factory-built. Alexandria is apartments and older villas, with tight electrical boards and air that never quite dries a closed room.
New towers and villas usually have three phase; older Alexandria flats run 220 V single phase and often need a board check before a heater is promised. Every wet room on this coast gets ducted extract on a humidistat, and fixings are stainless throughout, because salt air and a building shut for months are a poor combination for anything metal.
| Room | Indicative, thousand EGP | Typical use |
|---|---|---|
| Sauna, 2 person, solid walls | 150 – 215 | Alexandria flat or Sahel chalet |
| Steam room, 2–3 person | 235 – 370 | Villa bathroom conversion |
| Plunge tub with chiller | 175 – 380 | Sahel terrace, summer season |
| Commercial sauna, 10–14 person | 540 – 1 150 | New Alamein hotel or tower gym |
| Hotel thermal suite, small | 1 250 – 2 700 | New Alamein hotel |
Indicative, supplied and installed; fixed after a survey.
Alexandria is the natural port for this coast, so crates travel a short road leg west to the Sahel or New Alamein. A room takes 6–10 weeks from drawing approval to commissioning, which means a sauna for next summer should be drawn by early spring. Our crew commissions it, trains a caretaker and leaves the shutdown and restart checklist. Message us the plan of the terrace or apartment for an itemised figure.
A Sahel sauna that sits idle from October to June needs that routine: heater isolated, stones checked for damp before the first firing, the plunge drained and dried, the chiller covered against salt, and the extract left on its humidistat so the room does not sour behind closed shutters. It goes into the handover notes, and a maintenance contract can cover the opening visit each spring.
The Sahel is the strangest market we work in: a coastline that is full for three months and shuttered for nine. Everything about the schedule follows from that.
Nobody wants a contractor next door in August. We do the heavy work between October and April, which is also cheaper and faster because the roads are empty and the trades are available.
The corollary is that commissioning happens months before use, so we specify a proper shutdown and restart routine and leave it in writing — a suite that sits idle for six months needs draining, isolating and a checklist before the season opens.
Salt-laden air plus a building locked for months is how corrosion and mould get started. A4 stainless everywhere, a drained ventilated cavity, and a ventilation strategy that works while the house is empty.
We specify a run-on extract with a humidistat rather than a timer for exactly this: it runs when the air needs it, not when somebody remembered to set it.
Most clients here are not present. We photograph everything, send weekly updates, and leave a handover pack and a spares list with part numbers so a caretaker can deal with the common failures without waiting for us.
New Alamein is being built from nothing, which means we are usually working alongside the main contractor rather than after them. That is the best moment to build a wet room and the hardest programme to hold.
Working as a subcontractor on a tower means our programme depends on other people's. Cabins, benches and plant are built and dry-assembled in our Istanbul factory first, which keeps our on-site window as short as possible, because that window will move.
It also means the drainage, the extract routes and the electrical capacity can be right from the beginning, which is worth more than any finish.
A wet room above other apartments has to be tanked to a standard that assumes failure. Full membrane, upstands, a secondary drain where the layout allows, and a leak test signed off before anything is tiled.
Plant on a tower needs a serviceable location that does not involve a crane. We plan that with the developer rather than discovering it at handover.
Same as the Sahel: A4 stainless, drained cavities, humidistat-controlled extract. A sea-facing tower gets salt on the windward side year round.
Alexandria is humid in a way the rest of Egypt is not. A wet room here that does not dry out overnight will smell by the second season, and ventilation stops being a detail.
Mediterranean air does not dry a closed room. Every hot or wet room gets mechanical extract, ducted out, on a humidistat rather than a timer so it runs when the air needs it.
Vapour barriers must be continuous and correctly placed, warm side, with every penetration sealed. A barrier with gaps in this climate traps moisture inside the wall, which is worse than no barrier at all.
Much of Alexandria's good housing stock is old, with limited electrical capacity and service runs that were improvised decades ago. We survey the board and the risers before promising a heater size.
Mediterranean salt is real but gentler than the Red Sea's. Stainless fixings and a ventilated cavity remain non-negotiable; sealed plant enclosures are usually unnecessary here, which takes cost out.
Alexandria, with a short road leg to the Sahel and New Alamein. Freight, clearance and 14 per cent VAT are separate lines in the quote.
A lighter one. Stainless fixings and a ventilated cavity are essential; sealed, filtered plant enclosures are usually reserved for the Red Sea.
Allow 6–10 weeks per room after the drawing is approved, plus time for approvals. Ordering in early spring leaves commissioning comfortably before June.
We would rather not, and neither would your neighbours. October to April is faster, cheaper and quieter.
Yes, and on new towers it is usually the right arrangement. Rooms arrive factory-built from Istanbul, which keeps the on-site window short.
Because Alexandria's air varies. A humidistat runs the extract when the room is actually damp, which a timer cannot know.
Tell us the neighbourhood, send a photo of the space and the rough size. We reply within one business day with photos of comparable finished rooms and an itemised quote.

Saunas, steam rooms and cold plunge tubs for New Cairo, Sheikh Zayed, Katameya, Maadi and Zamalek homes. Facto…
Read more →
Saunas, steam rooms and cold plunges for El Gouna, Hurghada, Soma Bay, Sharm and Sokhna resorts and Nile lodge…
Read more →