
Saunas
Nobody in Lagos asks whether the grid will carry a 9 kW heater. The real question is how it sits alongside the…
Read more →A terrace installation in a Lagos tower is four separate problems: the lift, the slab, the waterproofing and the management company. All four are solvable and none of them tolerate being discovered late.
Indicative band: 2,5 – 45 million NGN, supplied and installed in Nigeria.
Across the continent: Coastal & island builds in all eight countries →

We measure the service lift — height, width, depth and diagonal — before quoting anything, and design panels that pass it with room to turn. A panel that fits the drawing but not the lift is a very expensive afternoon and a conversation nobody enjoys.
Where a component genuinely cannot go up the lift, the options are a redesign or a crane lift, and both belong in the quote rather than in a phone call during the build.
A 900-litre tub is close to a tonne once filled, and a tiled plunge basin is more. On a suspended terrace slab that is a structural question with a real answer, and we get an engineer's opinion before quoting rather than after. This is one of the few things we refuse outright.
The waterproofing is the second half of the same problem: a terrace membrane that was designed for rainwater is not automatically a membrane that will live under a permanently wet installation. We check it, and where necessary we detail a new one properly.
Terrace drainage has to take a full tub emptying without backing up into the apartment below, which is more water than the outlet was sized for. We design the discharge rather than hoping the existing gully copes.
Then there is the body corporate: a drawing, an elevation, a plant position and a noise figure. We prepare the submission, because a cabin refused after delivery is an expensive lesson and plant on anti-vibration mounts inside a louvred enclosure is what gets approvals through.
Usually, with a structural check and proper drainage. Without the check, we will not quote it.
Smaller panels, a redesign, or a crane lift — all of which go in the quote rather than surfacing later.
In our experience yes, with a drawing, a plant position and a noise figure. We prepare the submission.

Nobody in Lagos asks whether the grid will carry a 9 kW heater. The real question is how it sits alongside the…
Read more →
Lagos does not have a cool season and it does not have cold nights. A plunge here is a machine, and the machin…
Read more →
Nigeria has already built the hard part. Nigerian households added around 803 MW of solar in 2025 alone. What …
Read more →