
Marrakech
Private hammams, saunas and cold plunges in Marrakech: medina riads, Guéliz flats, Hivernage hotels. Factory-b…
Read more →The northern cities are four different briefs. Casablanca is apartments and padel clubs in humid Atlantic air; Souissi in Rabat is large, quiet villas and residences; Tangier sits next to the port our crates arrive at; and Fès is the medina where zellige is cut. The same factory and the same crew cover all four.
In this guide: Casablanca & Anfa · Aïn Diab · Rabat & Souissi · Tangier · Fès

In Casablanca the work splits between infrared and compact saunas for flats in Anfa, Gauthier and Californie, and recovery rooms for clubs — Padel Maps lists more than thirty padel clubs in the city. Rabat asks for complete indoor suites laid along one drainage line, with plant that cannot be heard. Tangier is villas in Malabata and on the Old Mountain, plus riads in the kasbah. Fès is almost entirely hammams in old dars, with zellige chosen close to where it is cut.
Flats run on 220 V single phase; villas and clubs usually have 380/400 V three phase. Along the coast humidity is the constant enemy, so every wet room gets ducted extract on a run-on timer and every fixing near the sea is stainless.
| Room | Indicative, thousand MAD | Where it usually goes |
|---|---|---|
| Infrared cabin, 2 person | 14 – 24 | Casablanca or Rabat apartment |
| Sauna, 2 person, solid walls | 32 – 46 | Flat or villa |
| Steam room, 2–3 person | 50 – 78 | Villa bathroom conversion |
| Gym recovery zone, 2 tubs + sauna | 70 – 150 | Padel club or gym |
| Hammam with zellige | 95 – 170 | Fès or Tangier riad |
Indicative, supplied and installed, and fixed after a survey.
For Casablanca and Rabat the crates can land at the port of Casablanca; for Tangier and Fès, Tanger Med is the obvious gate, with fast-track clearance of six to twenty-four hours (AJ Logistics). Each room takes 6–10 weeks from drawing approval to commissioning, and our own crew installs it. Message us with the room dimensions and a photo; a project manager replies within one business day with a first budget.
Casablanca is the commercial city, and most of what we build here is either an apartment room or a club recovery zone. Both are constrained by the building rather than the ground.
Casablanca is humid most of the year, which sounds harmless and is not. A wet room in a humid climate needs mechanical extract with a run-on timer, ducted out, or it never dries and starts to smell within a season. A window is not ventilation.
Timber choices follow: thermo-treated rather than untreated, stainless rather than plated fixings, and a deeper ventilated cavity behind any external cladding.
Corporate gyms and private clubs in Anfa and Californie are where the demand is growing fastest. The brief is throughput and durability rather than beauty: porcelain floors, benches that unbolt for deep cleaning, a channel drain that can be rodded, and finishes that survive daily chlorine.
Crates for Casablanca can come straight into the city's port, and service visits are grouped with installations in the same week so the travel is shared rather than billed twice.
On the corniche the Atlantic is thirty metres away and the wind carries salt onto everything. A cabin built here the way we build one inland will look tired in two years.
Fixings, first and always. Plated screws bleed rust down pale cladding within a season on this coast, so everything is A4 stainless, including the ones nobody sees. Then it takes glazing hardware, then any untreated timber end grain.
We specify a deeper ventilated cavity behind cladding, seal every end grain, and set plant back from the sea face wherever the layout allows.
The afternoon wind is constant and it strips heat from glass. We put the glass at right angles to the prevailing wind rather than facing it, shelter the plunge and the bench, and accept a smaller window in exchange for a room that is usable in the evening.
The corniche is beach clubs and hotels, where the product is the photograph as much as the session. A sauna and plunge on a deck with the Atlantic behind sells a membership; it also has to survive a winter of storms, which is the part that is not in the photograph.
Souissi is embassies, ministries and large quiet villas, and the work here is almost always indoors, complete, and discreet.
Our standard indoor layout is a short corridor with the hammam door, the sauna door and the plunge basin opening off one wall and a bench opposite. One drainage line, one plant access panel, three steps from hot to cold.
Three services decide whether this is a finishing job or a demolition job: a drain with a fall, a ducted mechanical extract, and a cable run back to the board. Get them in the build drawing and the rest is materials.
Diplomatic and official households want plant that cannot be heard and contractors who are not memorable. We site machinery internally, work to agreed hours, and provide the documentation and named contacts a facilities team needs.
Where the residence is held on a lease we build a demountable specification — bolted frame, single service connection point, no chasing into the structure — so the room can be removed at the end without making good.
Tangier is where our European equipment lands. Tanger Med handles eleven million containers a year and clears in six to twenty-four hours on the fast-track scheme — which makes lead times here the shortest in Morocco.
A Finnish heater ordered for a Tangier project can be on site within days of the vessel berthing. Inland, add the road leg; in a landlocked country, add weeks. We pass that through as a shorter programme rather than a lower price, because the price is what it is.
Every room is crated with a spares allowance, and a replacement part ordered later follows the same short route through the port rather than a long overland one.
Tangier's salt load is real but gentler than the Atlantic corniche, and the wind is less relentless. We still specify stainless throughout and a ventilated cavity, but glass can face the water here in a way it cannot at Aïn Diab.
The Tangier medina has the same hand-access constraints as Marrakech's, on steeper ground. Malabata and the newer developments are ordinary vehicle-access sites with modern slabs, and the two are priced completely differently.
Fès is where zellige comes from, and working here means working next door to the people who cut it. It is also the most difficult medina in Morocco to get anything into.
Fès is where zellige is cut. For a Fès project you can visit the cutters' yards, watch a piece being chipped to shape, and choose the glaze from what is being fired rather than from a sample board; we then specify the pattern and approve the pieces with you.
It also means shorter lead times on the one component that usually sets the pace of a hammam.
Fès el-Bali is almost entirely pedestrian and parts of it are stepped. Donkeys and handcarts are the delivery method, not a picturesque detail. We size panels to the route, deliver at dawn, and build in more on-site assembly than we would anywhere else.
That is a labour line and a schedule line. We put both in the quote rather than discovering them in week two.
Dars here are centuries old and nothing inside a wall is certain. We open up, look, and price the drawing afterwards. A hammam quoted from a floor plan alone in Fès is a quote that will change.
Usually an infrared cabin or a small Finnish cabin on single phase, yes. We measure the lift and the stairwell first and check the circuit your electrician can provide.
Yes. Crates are sized to the route, which in Fès el-Bali often means handcart and donkey at dawn, and we open up the walls before fixing the drawing.
Casablanca for Casablanca and Rabat, Tanger Med for Tangier and Fès. The Incoterm and the clearance cost are stated in the quote.
Yes. Without mechanical extract on a run-on timer, a wet room in Casablanca does not dry out overnight, and that is how the smell and then the mould start.
Built inland-spec, half. Built for the coast — stainless, deeper cavity, sealed end grain — the same as anywhere.
Yes, on the demountable specification: bolted frame, one service point, nothing chased into the structure.
Yes, materially. Tanger Med clears in 6–24 hours under the expedited scheme and it is on the doorstep.
Not dramatically, but lead times are shorter and you can choose from the kiln rather than a sample board.
Tell us the neighbourhood, send a photo of the space and the rough size. We reply within one business day with photos of comparable finished rooms and an itemised quote.

Private hammams, saunas and cold plunges in Marrakech: medina riads, Guéliz flats, Hivernage hotels. Factory-b…
Read more →
Saunas, hammams and plunge pools for Palmeraie villas, Ourika-road estates and High Atlas lodges. Built in our…
Read more →
Saunas and cold plunges for Taghazout surf camps, Agadir hotels, Essaouira riads and Dakhla kite lodges: salt-…
Read more →