Cold plunges
A chiller fights the gap between the water and the air around it. In Nairobi that gap nearly closes overnight,…
Read more →Nairobi sits at about 1,795 metres, higher than Johannesburg. Thin air carries less heat per kilowatt, so every cabin we quote for the capital has its heater corrected for altitude, and the correction is printed on the quote where you can check it.
Typical project in Kenya: KES 390k – 1,300k, supplied and installed · six to ten weeks per room after the drawing is approved, plus shipping.
Across the continent: Saunas in all eight countries →

Our base figure is about 0.85 kW for each cubic metre inside a well-insulated cabin; for Nairobi we multiply that by an altitude factor of about 1.15, then add capacity for any glass. A four-person cabin of ten cubic metres that would take an 8 kW heater in Mombasa usually lands on 9 or 10.5 kW in Karen or Runda.
That step often decides the supply too. Kenya Power delivers 240 V to most homes and 415 V where three phases are connected; above about 8 kW we want three-phase, so we find out what your board can give before the cabin is drawn, not after it is crated.
Walls, benches, doors and heater guards come out of our own Istanbul factory, which has been making saunas since 1987. Each Kenyan cabin is put together there once, dry, and inspected; then every panel gets a number and goes into a crate alongside the screws, gaskets and a few spare parts.
The crates clear customs at Mombasa and travel the Northern Corridor to Nairobi, or take the coast road south to Diani. Our own installation crew assembles the cabin, connects it to the circuit your electrician has prepared, commissions it with a thermometer and trains whoever will run it. Allow six to ten weeks from drawing approval, plus the sea passage.
Inland: the altitude correction, red murram dust on the vents in the dry months, A2 fixings, service twice a year.
On the coast: sea-level heater sizing, A4 stainless for every hinge and screw, a deeper ventilated cavity and sealed end grain, because Indian Ocean salt finds the smallest metal part first.
At a Mara or Laikipia lodge: dust filtration on the plant, sequencing with the solar array, and often a wood-fired heater that keeps working when the batteries are flat.
| Cabin | Indicative, thousand KES | What is inside |
|---|---|---|
| 2 person, solid walls | 390 – 560 | 6 kW heater, timber lining, stone plinth |
| 4 person, one glass wall | 580 – 870 | 9 kW heater including the altitude correction |
| 6 person, charred exterior | 880 – 1,300 | Structural glass, tower heater, steel sub-frame |
| Commercial, 10–14 person | 1,400 – 2,900 | Three tiers, commercial controls, external switch |
Figures are supplied and installed and confirmed after a site survey, in person or by video. The cable run from your board and any civil work sit on their own lines. Message us the room size and a picture of the spot; the reply, with a position-by-position quote, comes the next business day at the latest.
Yes. At 1,795 m the same heater delivers noticeably less heat into the room, so we go roughly one step up the range and show the arithmetic. A cabin that never gets properly hot in the capital almost always had its heater picked from a sea-level chart.
Six to ten weeks for a single cabin after you approve the drawing, plus the voyage to Mombasa and the road leg. A complete villa suite runs twelve to sixteen weeks.
Usually. If the shell and insulation are sound, a correctly sized heater and a vent adjustment transform the room for a fraction of a rebuild. Send us the heater model and the cabin dimensions first.
Send us a photo of the spot and the rough size. Within one business day you get photos of comparable rooms we have finished and an itemised, position-by-position quote.

A chiller fights the gap between the water and the air around it. In Nairobi that gap nearly closes overnight,…
Read more →
Steam rooms fail behind the finish. The tiles in a leaking room usually look perfect; it is the board, the joi…
Read more →
Kilimani, Kileleshwa and Westlands flats seldom come with a three-phase board, a drain in the floor or a spare…
Read more →