
Saunas
A cabin for a Camps Bay winter, a cabin for a Highveld hailstorm and a cabin for Umhlanga humidity are three d…
Read more →Most of our service calls are for somebody else's installation. In this country they come down to four things: stones never turned, a scaled generator, a corroded coastal fixing, or a chiller that was never needed in the first place.
Indicative band: 1,9 – 76 thousand ZAR, supplied and installed in South Africa.
Across the continent: Service & repairs in all eight countries →

Sauna: stones out, sorted, turned or replaced, element resistance checked, thermostat and overheat cut-out tested, bench fixings tightened, timber cleaned, vents cleared.
Steam: generator descaled to an interval set by your actual water, probe cleaned, trap flushed, silicone checked, extract tested. Plunge: condenser cleaned, pressures read, cartridge changed, ozone cell checked, water tested.
On the KZN coast and the Cape peninsula we add a corrosion inspection of every fixing, hinge, latch and enclosure, plus the end grain of exposed timber.
In the bushveld we add a dust inspection: condenser, pre-filters and vents. Different enemy, same discipline.
An old cabin with a sound shell is usually worth re-lining rather than replacing: strip the benches and lining, check the vapour barrier and insulation, re-line, new heater and controls. It comes in well under a new cabin.
We also convert existing plunge tubs onto a battery-backed circuit, which is a small job that changes how the tub behaves.
Cape Town and the Winelands regularly; Johannesburg, Pretoria, KZN and the Garden Route in scheduled blocks so the travel is shared.
Two to four years with quarterly turning. Unturned they pack down, choke airflow and burn out the element.
Often yes, if it was built on a bolted frame. We survey it before promising.

A cabin for a Camps Bay winter, a cabin for a Highveld hailstorm and a cabin for Umhlanga humidity are three d…
Read more →
South Africa is the only market we work in where we regularly talk clients out of a chiller, and it is worth u…
Read more →
Load shedding has ended — South Africa has now gone more than 475 days without it, and passed a full year with…
Read more →